How does SolarAPP+ verify the location of service disconnects at permit issuance?
There are items in the fire bulletin and inspection checklist regarding disconnect location that the inspector must verify before a project is approved. The items are listed below:
- “If connected equipment is NOT within line of sight or closer than 10ft to the point of interconnection, disconnect or isolation means are installed.”
- “Disconnecting Means are in compliance with the SolarAPP+ Fire Bulletin.”